City of Wichita - Stormwater Management Stormwater Construction Details
Tuesday, May 22, 2012 :: Currently 75 degrees in Wichita

Stormwater Construction Details

100 Series - Curb Inlet Details
PDF Standard Detail Name Last Revision
SW101

Standard Type 1 Curb Inlet 5'-0" or 10'-0" Opening

11/2010
SW102

Standard Type 1 Curb Inlet 15'-0" Opening

11/2010
SW103

Standard Type 1A Curb Inlet 5'-0" or 10'-0" Opening

11/2010
SW104

Standard Type 1A Curb Inlet 15'-0" Opening

11/2010
SW105

Standard Single Type II Curb Inlet

11/2010
SW106

Standard Double Type II Curb Inlet

11/2010
SW107

Special Type II Inlet/Manhole

11/2010
SW108 Grated Driveway Inlet (Single) 11/2010
SW109 Grated Driveway Inlet (Double) 11/2010
SW110

Inlet Beam

11/2010
SW111

Curb Inlet Pavement Underdrain Detail

11/2010
200 Series - Drop Inlet Details
PDF Standard Detail Name Last Revision
SW201

Single/Double Drop Inlet

11/2010
SW202

Double Double Drop Inlet With Beam

11/2010
SW203

Backyard Inlet

11/2010
300 Series- Stormwater Manhole Details
PDF Standard Detail Name Last Revision
SW301

Precast Concrete Manhole (Storm Sewer)

11/2010
SW302

Reinforced Concrete Manhole (Storm Sewer)

11/2010
SW303

Manhole/Inlet Frame & Cover (Storm Sewer)

11/2010
400 Series - Misc. Stormwater Details
PDF Standard Detail Name Last Revision
SW401

Miscellaneous Details (Storm Sewer)

11/2010
SW402

Headwall Details for 15", 18", & 24" Pipe

11/2010
SW403

Headwall Details for 30" & 36" Pipe

11/2010
SW404

Headwall Details for 42" & 48" Pipe

11/2010
500 Series - Sediment & Erosion Control Details
PDF Standard Detail Name Last Revision
SW501

Back of Curb Protection, Curb Inlet Protection & Construction Entrance

11/2010
SW502

Silt Fence Ditch Check & Barrier Details

11/2010
SW503

Straw Bale Ditch Check & Barrier Details

11/2010
SW504 Street Improvement Projects 11/2010
SW505 Subdivision Development Process 11/2010

Orange construction signage showing people at work

Public Works & Utilities
Stormwater Management Division

City Hall, 8th floor
455 N. Main
Wichita, Kansas 67202

Hours:
8:00 AM - 5:00 PM
Monday - Friday

Phone: (316) 268-4498

Scott Lindebak, P.E.
Stormwater Engineer