SUBDIVISION AND UTILITY ADVISORY COMMITTEE AGENDA APRIL 12, 2007 The regular meeting of the Subdivision Committee of the Metropolitan Area Planning Commission will be held on Thursday, April 12, at 1:30 p.m., in the METROPOLITAN AREA PLANNING DEPARTMENT, DIRECTOR'S CONFERENCE ROOM - Tenth Floor, City Hall, 455 North Main, Wichita, Kansas. 1. VAC 2007-07: Request to vacate a portion of complete access control, generally located 1/4-mile east of I-235, on the northwest corner of Bebe and Maple Streets. A complete legal description is available for public inspection at the Metropolitan Area Planning Department - Tenth Floor, City Hall, 455 North Main Street, Wichita, Kansas. 2. VAC 2007-08: Request to vacate a portion of a railroad, utility and drainage easement, generally located on the south side south of 34th Street North and west of Webb Road. A complete legal description is available for public inspection at the Metropolitan Area Planning Department - Tenth Floor, City Hall, 455 North Main Street, Wichita, Kansas. 3. VAC 2007-09: Request to vacate a portion of platted complete access control, generally located approxi- mately 900-feet east of Edgemoor Avenue on the southwest corner of Brookside Parkway and Central Avenue. A complete legal description is available for public inspection at the Metropolitan Area Planning Department - Tenth Floor, City Hall, 455 North Main Street, Wichita, Kansas. 4. SUB 2007-17: Final Plat -- SAVINA 5TH ADDITION, located north of 29th Street North and west of Broadway. Engineer: Baughman Company, P.A. Acreage: 6.56 Total Lots: 38 5. SUB 2007-26: One-Step Final Plat -- NORTHRIDGE INDUSTRIAL SECOND ADDITION, located west of Hillside and on the north side of 37th Street North. Engineer: Poe and Associates, Inc. Acreage: 26.3 Total Lots: 1 6. SUB 2007-27: One-Step Final Plat -- NORTHRIDGE INDUSTRIAL THIRD ADDITION, located south of 37th Street North and west of Hillside. Engineer: Poe and Associates, Inc. Acreage: 4.7 Total Lots: 1 7. SUB 2007-29: One-Step Final Plat -- DAVIS-MOORE 14TH ADDITION, located on the south side of Kellogg and west of Greenwich Road. Engineer: K. E. Miller Engineering, P.A. Acreage: 28.1 Total Lots: 1 8. SUB 2007-30: One-Step Final Plat -- LILLIE 2ND ADDITION, located south of Maple and on the west side of Maize Road. Engineer: Baughman Company, P.A. Acreage: 17.26 Total Lots: 3 OTHER BUSINESS: Subdivision Committee and Utility Advisory Committee Agenda April 12, 2007 Page 2